As a compliance selects, brings and installs equipment for the apartment

by decoredhome.com


We strive to ensure that the interior turns out to be as convenient for you. The technical equipment of the apartment simplifies life and makes it comfortable. So that you do not spend your strength and time to search for technology, we transferred this task to the compliance. In the article I will tell you how this specialist is looking for technology and engaged in its import and installation.

Content

  1. Stage 1. Selection of technology
  2. Stage 2. Purchase of equipment
  3. Stage 3. Delivery
  4. Stage 4. Installation
  5. Stage 5. Check
  6. Conclusions: What is the useful setor

Stage 1. Selection of technology

The compliance begins the selection of equipment after the designer has made all the drawings and visualization. She studies a design project and begins to look for specific positions.


Photo: The location of the technique indicates the drawings

Most of the technique must be selected for the kitchen. Here the compliance is studying the drawings of the kitchen and looking for options for built -in equipment suitable in size.
It can be an induction stove, an oven, a dishwasher, a microwave and a refrigerator.

Photo: our furniture workers are designed according to individual drawings

After that, the compliance studies the characteristics of the technique and, based on his experience, chooses the most optimal specimens, which he then submits to coordinate to the client.

Photo: The setter chooses reliable and proven models

If you have preferences on the models and characteristics of the technique, then the compliance will add these positions to the project and will engage in their purchase, delivery and installation.

Photo: We will find the optimal solution from your favorite brands

The compliance selects not only household appliances for the kitchen, but also an extract, water filters, a dispute and more.

Photo: Auxiliary equipment is also selected by the set of

For the bathroom, the compliance is looking for a washing, drying machine and an electric dryer.

Photo: The washing and drying machine is selected based on the size of the family and its needs

In residential premises, the compliance selects air conditioners, televisions, projectors, prefixes, wifi routers, electric curtains, moisturizers and much more.

Photo: In this room, the settrator selected an electric fireplace for the interior style

Stage 2. Purchase of equipment

When the compliance agreed on the position on equipment with the client, he proceeds to the purchase of equipment. Before buying, the compliance carefully double -checks the model, parameters and characteristics to exclude errors. The equipment is purchased convenient for the client. You can buy all positions or in turn at once.

Stage 3. Delivery

The equipment is delivered to the apartment gradually. First for the bathroom, then for the kitchen and then for living rooms. This is done so that it does not accumulate in the apartment and does not interfere with the repair. The compliance agrees in advance with the stores so that they save the goods in their warehouse and brought in a convenient time. Before the equipment is brought to the apartment, the compliance is studying the sizes of doorways, the elevator schedule and other parts that may affect delivery.

There are often situations when the washing machine is wider than the doorway in the bathroom. In this case, the configurator first delivers the washing machine, and only then the experts put the door.

Stage 4. Installation

After the equipment has been delivered to the apartment, the compliance organizes its installation. She finds suitable specialists and monitors the deadlines.

Photo: All equipment is installed and set up for work

Stage 5. Check

All installed equipment is checked by a technical control specialist. If everything is done correctly, he accepts work. If not, then the compliance binds to the store and solves the situation. In any case, when the client enters the apartment, everything will be configured for him and work correctly.

Conclusions: What is the useful setor

  • The compliance saves your strength and time. You do not need to study the market, prices and characteristics of the model – all this will be done for you by the compliance
  • The compliance allows you to save the budget. He can buy equipment in advance until prices rose, or during shares.
  • The compliance agrees with the suppliers so that they support the already purchased equipment in their warehouse so that it does not interfere in the apartment.
  • The customer does not need to worry about the characteristics of the technique, the compliance will definitely select the desired model without errors
  • The client does not need to come to the apartment to check the equipment, meet delivery, think about how it will be entered. The compliance organizes everything.



Source

Related Posts

Leave a Comment

This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Accept Read More