Financial work follow the draft and are a shell of any interior. The appearance of space and comfort depends on them. In the article, we consider what is included in the finish and in what sequence the work is performed. Before moving on to the final stages, the designer must prepare all the necessary drawings such as: floors plan with laying tiles, ceilings plan, a plan of lamps, scanning along the walls, a plan of underfloor heating, statements of finishing materials and furniture.
Content:
- Stage 1. Drywall
- Stage 2. Porcelain stoneware
- Stage 3. Mill
- Stage 4. Floors, doors, skirting boards
- Stage 5. Stretch ceiling, sockets, switches, finishing plumbing, lamps
- Stage 6. Furniture and decor
- Moving
Stage 1. Drywall
Partitions made of drywall, boxes or ceiling from GKL are made 3-4 weeks after filling the screed. During this time, the screed dries thoroughly. Before working with a gypsum plasterboard ceiling, the supplier purchases drywall, glue, metal profiles and other materials. The compliance purchases hatches, tracks, built -in lamps 10-20 days before the assigned work. All these elements are coordinated with the client before buying.
Photo: In our company, the supplier purchases draft materials, and the compliance is engaged in finishing materials that are part of the interior.
If the apartment has all the necessary materials, drywalls begin to repair. When they finish the work, a technical control specialist comes to the apartment and checks the finish. If everything is fine, the client accepts and pays for work.
Photo: drywall partition
Stage 2. Porcelain stoneware
Before laying porcelain tiles, the buyer must agree with the client grout, a warm floor, bathroom and porcelain tiles 40 days before the start of work. The supplier delivers glue and primer. Next, the tiles begin the process of laying tiles, grout, washed down the corners of 45 degrees. When everything is ready, technical control accepts the work, and the client agrees and pays for the work.
Photo: porcelain tiles begin to be laid from the bathroom
Stage 3. Mill
Before starting painting, the designer must agree on wallpaper, paint, moldings, hidden doors, window sills and slopes. If the apartment is provided for paint, then the designer must make preliminary coloring on the walls to choose a color shade. When everyone agreed with the client, the compliance should be purchased all this 10 days before the start of work. After that, malyars enter the apartment and do their part of the work. When everything is ready, technical control comes and accepts work. Further, the client agrees and pays for this stage of work.
Photo: paint is selected in the apartment in natural light
Stage 4. Floors, doors, skirting boards
In order to start this stage, the designer must coordinate with the client of the door, skirting board, flooring and make a mulboard – a collage from materials where you can see how they are combined with each other. The designer also selects the temperature for lighting.
Photo: designer selects materials according to samples
The compliance should purchase floors, doors and skirting boards 40 days before the start of work. On the supplier – the delivery of glue, bulk floor and substrate. When everything is ready, builders install doors, floors and skirting boards. Next comes technical control and accepts the finish. The client pays for the stage.
Photo: designers take samples of materials to the apartment and look at how they are combined with each other
Stage 5. Stretch ceiling, sockets, switches, finishing plumbing, lamps
At this stage, the compliance purchases and brings a stretch ceiling, sockets, switches, finishing plumbing to the apartment. Purchases begin 30 days before the start of the repair. Builders screw the sockets, collect and hang chandeliers, install plumbing. When everything is ready, technical control arrives and checks how smoothly they made a stretch ceiling, whether there are scratches or spots on it. Rosettes, switches and lamps are checked for performance.
Photo: At this stage, the apartment is already ready to install furniture
Stage 6. Furniture and decor
The compliance purchases furniture and decor 90 days before the start of work, because it takes a lot of time to order furniture on order. The client must coordinate the models in advance so that the repair does not stop. Next, all the furniture is delivered and collected. Tech control takes furniture and monitors that everyone is collected with efficiently and without chips.
Photo: Mirror doors are installed last
Moving
When everything is done, the client makes things and begin to learn the space. At this stage, the customer gets acquainted with the space and can make a list of what can be finalized. Our experts will come and correct everything in one day. SUCCELY after everything perfectly completes the repair.
Conclusions
Repair is a complex and long process, which consists of many stages and requires a certain experience, time and effort. In our company, we have established the process of repair to automatism. We try to do everything quickly and with the minimum participation of the client. You can read about how we control the repair here: “We control the project – you are resting.”