How long does it take to create drawings

by decoredhome.com


The design project allows you to think through the space in the smallest details and realize all the ideas of our customers. It is important to make drawings quickly so as not to stretch the repair process. In this article, we will consider how much time the development of each individual drawing takes on the example of the created design project.

Content

  1. The grade plan
  2. Plan of arranging furniture
  3. Binding plan for plumbing equipment
  4. Dismantling and installation plan
  5. Plan of flooring
  6. Ceiling plan
  7. Lighting plan
  8. Plan of sockets
  9. Wall scan plan
  10. Conclusion

The grade plan

The creation of drawings begins with a measured plan. It is done after measuring the apartment. First, the designer draws the drawing by hand, and marks all sizes on him. Then she tolerates all values ​​to the grade plan.

The designer prepares this drawing for 1-3 days.

Photo: a grant plan

Plan of arranging furniture

After the measured plan, they move to the plan for arranging furniture. This drawing is made longer than the rest, because the plan is worked out in detail with the client.

Photo: plan to arrange furniture

The designer can prepare several options for planning to arrange furniture, then the client selects the most convenient option from them.

Here it takes more time to study the details, so the final plan is prepared on average in 2-5 days.


Photo: a plan for arranging furniture can be in several versions

Binding plan for plumbing equipment

The plan for the binding of plumbing equipment is an addition to the plan for arranging furniture. It indicates the location of the plumbing, which will be in the apartment.

The drawing is prepared in 1-2 days.

Photo: Plan of plumbing equipment

We value the time and attention of our customers, so the designer sends drawings for approval not one, but packages. It turns out easier to navigate in the drawings, and the client does not need to be constantly distracted by repairs and study plans. He can highlight, for example, an hour of his time and in detail familiar with the plans proposed by the designer.

On average, a metering plan, a plan for arranging furniture and a plan of plumbing equipment, a designer prepares in one week.

Dismantling and installation plan

In the case when the apartment needs redevelopment or replacing any elements, the designer makes a plan of dismantling and installation. If the apartment should be redeveloped, then the drawings are prepared for 2-5 days. The term depends on the complexity of redevelopment and the speed of coordination of drawings with the customer.

Photo: Dismantling plan without redevelopment

If in the apartment you need to replace radiators, pipes or front door, then drawings are prepared in 2 to 3 days.

Photo: installation plan

If the apartment does not need to change anything or reduce these plans then, and the designer goes right away to other drawings.

Plan of flooring

The floor of flooring is prepared after the client has decided on the floor. Here the designer needs to agree on the layout of the flooring in different rooms.

The drawing is prepared in 1-3 days.


Photo: Paul Plan

If there is a warm floor in the apartment, then the warm floor is additionally made. The drawing is made in parallel in the same period as the floor plan.

Photo: warm floor plan

Some drawings can be done in parallel, therefore, they do not require additional time to develop

Ceiling plan

This drawing reflects what the ceiling, its size and the presence of levels will be made from.

Such a plan is prepared in 1-2 days.

Photo: ceiling plan

When the demonstration and installation plans are ready, the plans of flooring and the ceiling, their package is sent for approval to the customer. On average, they are made for 3-5 days.

This method accelerates the repair process. Builders do not need to wait for weeks until all drawings are ready, they can start work according to those plans that are already agreed with the client.

Lighting plan

On the lighting plan, the designer denotes lamps on the ceiling, walls and chandeliers.

Photo: plan for arranging lamps

They also make a plan of lamps in groups. There, separately indicate lamps on the wall and ceiling.

Both drawings are prepared in 2-3 days.

Photo: Lamps plan by groups

Plan of sockets

The plan of the sockets contains information about the location of sockets, switches and electric vehicles. Also there indicate the location of regulators, the Internet and TV outlets.

The plan is prepared for 2 – 3 days.

Photo: plan of sockets

Wall scan plan

When all plans are ready, the designer makes wall expansion for each room.

This process is time -consuming and takes from 2 – up to 5 days.

Photo: wall scan in the office

The last package consisting of a lighting plan, a plan of sockets and wall opening plans are prepared for 3 – 5 days.

Conclusions

If you summarize, then the designer prepares all the necessary package of drawings in 10-14 business days. During this period, the designer discusses drawings with the client, makes edits and offers suitable solutions. The designer agrees with the client several drawings at once, so that after coordination, to immediately give them to the builders and not waste time in this way we are less disturbed by our customers and accelerate the repair process.

Write to us on WhatsApp and we will calculate the deadlines and cost for the design project



Source

Related Posts

Leave a Comment

This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Accept Read More