When customers ask about the terms of repairs, we call an approximate, but as close as possible to reality the figure. This is due to the fact that even in apartments with the same area, repair can take different times. In this article I will tell you what affects the period of repair, how much time it takes to repair with specific examples.
Content
- What depends on the repair period
- From the state of the apartment
- From the involvement of the client
- From finishing materials
- From the need to redevelop the apartment
- From technical equipment
- Examples of apartments with specific time periods
- Two -room apartment 68 m2 for 6 months
- Three -room apartment 112 m2 for 11 months
- Conclusions
What depends on the repair period
Such factors as:
- initial finish and condition of the apartment
- The degree of client’s involvement
- Finishing materials
- The redevelopment of the apartment
- Technical equipment
At the beginning of the repair, our experts voiced the most real period for which builders will be able to complete this or that stage of work, and the designers will make the interior. We indicate all the current terms in the contract and observe them
From the state of the apartment
The apartment in a new building can be completely without finishing, where there are only walls, or with pre -trim. The apartment without finishing is prepared longer, about 2 – 3 months than an apartment with pre -trim.
Photo: In the pre -trim there is wall preparation
This is due to the fact that at the stage of the draft, it takes a lot of time to technical processes, such as drying plaster or screed, as well as for coordination of electricians and lighting.
Photo: Quality of all apartments with pre -lane finishes are different
But this rule applies only to well -prepared finishes. We often come across apartments with pre -trim where there are many flaws. The developer rents apartments with a curve plaster and a screed, with a bad electrician and a small number of sockets. As a result, you have to redo everything and the repair is delayed.
Photo: Often come across apartments with poor decoration from the developer
So that you do not have to finish the work of developers, we have a service for the acceptance of the apartment. The specialist will come to the apartment and check everything using special devices. If there are problems, the inspector will indicate them to the developer so that he will convert them at his own expense.
From the involvement of the client
We work so that the customer takes a minimum participation in the repair. We have a huge team where everyone performs part of his work in order for the repair to be quickly. If the client doubts, our designers will tell the most convenient options. All these efforts become in vain if the customer does not coordinate the design in time and does not pay for work and materials. This attitude leads to delays and breaks the entire technological process that we have established for years. Therefore, we are always in touch with the client and remind him if he needs his participation.
Photo: Project manager is always in touch with the client
We made the customer’s interaction with the repair as convenient as possible. He can accept work, coordinate reports in a mobile application from anywhere in the world and at a convenient time.
From finishing materials
Dear materials require more time and skill when working with them. Mount a large -format porcelain tile longer than quartzvinyl. Walls for painting need to be perfectly aligned and glued glass chicks. The stretch ceiling can be pulled in 1 day in the entire apartment, but the ceiling made of drywall will have to be made for several months.
Photo: Work with an expensive finish longer and more difficult
From the need to redevelop the apartment
If the apartment needs to be redeveloped, then you will have to spend more time developing drawings, installation and dismantling of partitions.
Our designers offer only the redevelopment that can be legalized. Because if you just redo the plan, it will be difficult to sell the apartment in the future and you can get a fine from the housing inspectorate.
Photo: redevelopment requires additional approval
From technical equipment
To install systems such as supply and exhaust ventilation, intellectual lighting, warm floors and protection against leaks, additional time is required. These systems must first be designed on the drawings, and then install in the apartment.
Examples of apartments with specific time periods
Below we will consider two apartments: in one repair it took 7 months, and in the other 11. They are different in area and decoration, but give an idea of the speed of repair.
Two -room apartment 68 m2 for 6 months
We prepared this apartment for a young couple. Customers were in a hurry with moving, so our designers began to prepare the main drawings even before receiving the keys to the apartment, focusing on the floor plans from the developer. When customers received the keys, repairs began. The apartment already had a pre -trim, and the builders remained only finishing work.
Photo: kitchen-living room in the apartment 68 m2
For six months, the masters managed to poke the wallpaper on the walls and lay quartzvinyl, install a stretch ceiling with built -in lamps, remake an electrician from the developer – add sockets and connection points.
Photo: bedroom
In the bathroom, the walls and floor with porcelain tiles, made a warm floor, shower and installation with closed regiments. Installed all, plumbing, mixers, washing and drying machine.
Photo: Bathroom
Cabinet furniture in the apartment was made in our production. At the end of the repair, all the furniture was delivered and collected, and the technical control specialist checked the build quality.
Photo: cabinet was designed by furniture workers
The apartment managed to make an apartment in such a short period, because the designer quickly prepared all the drawings and visualizations, and the customers agreed on all work on time and chose democratic materials.
Three -room apartment 112 m2 for 11 months
This apartment was made for almost a year. Unlike the first project, there was no finish.
Photo: kitchen-living room in the apartment 112 m2
For decoration, they used paint on the walls, moldings and decorative panels. Because of this, I had to prepare the walls longer. Also in the apartment they made a drywall ceiling with sound insulation.
Photo: In the decoration used expensive materials
On the floor it was necessary to use several flooring – such as parquet and large -format porcelain stoneware. Doors in the apartment of hidden installation. The apartment has a large number of illumination, lamps and track lighting. There are systems from leaks, warm floors and other systems to increase comfort. All these decisions required maximum accuracy and additional time to work.
Photo: backlight in the decoration
In the bathroom they made a shower, a bath and installation. For decoration, large -format porcelain tiles were used.
Photo: Bathroom with shower, bathroom and bathroom
All furniture in the apartment is made to order. It was developed and done in parallel with repair work. Our experts worked for almost a year and were able to meet exactly in the intended time. Customers calmly selected the interior, thought over materials and furniture. We always pay special attention to the quality and the decoration is durable, and the interior is convenient.
Conclusions
- Our experts carefully study your apartment and on the basis of these data set the real time period
- A whole team of experts is working on the repair: a designer, a compliance, a furniture, a foreman with a brigade, a project manager and a specialist in technical control are included there. Thanks to this approach, many work is in parallel and we save time for repairs.
- We do not sacrifice quality in exchange for speed. The entire finish is carefully prepared and checked.
To make repairs quickly and efficiently, write to us on WhatsApp and we will calculate the full cost of work.